Late notice, but there may be some 'able bodied' enthusiasts willing to help move, break and place rock at Maratoto on Sun 16. The aim is to repair a section about 700m from the gate and it's essentially physical labour.
Too many people will fall over each other so if you are able to help, email me on access@nzfwda.org.nz so there is some idea of numbers. Start time will be 10am Sunday at the ford.
Maratoto work on Sun 16 Oct
-
- Hard Yaka
- Posts: 688
- Joined: Wed Mar 01, 2006 12:00 pm
- Location: Auckland
- mudlva
- Hard Yaka
- Posts: 2918
- Joined: Mon Apr 16, 2007 12:00 pm
- Location: fixing another cv!! dam lockers (Papakura)
Re: Maratoto work on Sun 16 Oct
update.... how did it go today guys??
Re: Maratoto work on Sun 16 Oct
Well there was only three of us today..
But we tidied up what was done on Saturday.
A heap of rock (20 something ton) was moved in by trailer and deposited to restore the track.
And stop a nasty off camber bit.
The guys on Saturday did a great job...
The track was very slippery with all the traffic on it from Saturday.
I will let Peter V fill in the rest.
Calvin

But we tidied up what was done on Saturday.
A heap of rock (20 something ton) was moved in by trailer and deposited to restore the track.
And stop a nasty off camber bit.
The guys on Saturday did a great job...

The track was very slippery with all the traffic on it from Saturday.
I will let Peter V fill in the rest.
Calvin
Cheers Calvin
KZJ78 Landcruiser Prado...
KZJ78 Landcruiser Prado...
- mudlva
- Hard Yaka
- Posts: 2918
- Joined: Mon Apr 16, 2007 12:00 pm
- Location: fixing another cv!! dam lockers (Papakura)
Re: Maratoto work on Sun 16 Oct
that means there was half the amount from yesterday
it was very entertaining bringing my little machine down yesterday afternoon
oh and we moved 28t as well
it was very entertaining bringing my little machine down yesterday afternoon
oh and we moved 28t as well
-
- Hard Yaka
- Posts: 688
- Joined: Wed Mar 01, 2006 12:00 pm
- Location: Auckland
Re: Maratoto work on Sun 16 Oct
An excellent effort by all involved and that vital bit of trail is hopefully now secure. Much easier to fix before it all slid into the valley. There are still some areas that will need work along the Maratoto trail but they've had to wait until it was made safe to get a digger up the trail.
When will the gate open? Depends on the amount of rain over the next few days.
When will the gate open? Depends on the amount of rain over the next few days.
Re: Maratoto work on Sun 16 Oct
Awesome, felt guilty all day Sunday for not coming to help!!!!!
Better get the wombat done so I can take it up the track before it gets wrecked!!!!!!
Better get the wombat done so I can take it up the track before it gets wrecked!!!!!!
lax2wlg wrote:Is that like saying 'she's hot, for a crackwhore??
-
- Hard Yaka
- Posts: 688
- Joined: Wed Mar 01, 2006 12:00 pm
- Location: Auckland
Re: Maratoto work on Sun 16 Oct
The first stretch is pretty good now but there are still some soft bits and at least one troublesome hole, so two vehicles or a winch.
The gate will open on Friday 21 Oct
Digger work is planned for before Xmas.
The gate will open on Friday 21 Oct
Digger work is planned for before Xmas.
-
- Hard Yaka
- Posts: 284
- Joined: Tue Mar 15, 2011 1:59 pm
- Location: East Auckland
Re: Maratoto work on Sun 16 Oct
just making sure gate will be open on friday , hoping to go up on saturday
-
- Hard Yaka
- Posts: 688
- Joined: Wed Mar 01, 2006 12:00 pm
- Location: Auckland
Maratoto phone service
Because the weather and other problems can require that the Maratoto trails are sometimes closed to 4x4 use, it can pay to check the phone service on 027 5242132 before you travel.