Day 1 and 2 of a 5 day rush.
5 days to work on the Volvo in a row.
I work on creating the nice entry of the 4 power steering hoses into the cabin LEFT, RIGHT, POWER and RETURN .
Day 1
Remove the brake and booster and the clutch cylinders . We cut and brace the dash.
Cut the hole for the hoses and start the plate from 4mm alloy.
Day 2 then assist with the wiring of the central locking putting the wiring internally in the door frame.


5.15pm we have glued down the rear cabin alloy valance. Day work is over no wait the horse float is out we can get to the front roll cage. Pick it up and install it slowly. The horse float is reversed back in as we finish. The truck is complete no more large parts remain to be bolted down.

The roll cage looks good in the new colours.

The 4 hole plate which is giving me grief

6.10pm leave the workshop. Then the trusty Isuzu DIES about 500meters from the workshop engine check light on. It runs enough with light off to get it back to the workshop, leave it and leg it the 2+k back to the hotel via a halfway meal and a cold beer to cure my sorrows. I think its fuel filter will check in morning.