First to go was the roofrack and then the rear seat, in its place a storage box was built.
New seats
Airflow Snorkel has been fitted, probably will spend more $$$ and get a better quality one...but it seems to do the job anyway
The front shovel (PTO bumper) is off now, thats 100kg less weight
Look at the approach angle now
This is the PTO drive off the TCase, which has a crack in it, I'm guessing I have smacked it against something
The Aircon radiator thingy has been removed which should help cooling, will look at putting in a couple of small on demand fans, some hooks have been put on, these will be replaced soon with a new 12v winch and new barwork which include hooks.
Next job is to get the radiator out and get it tested and rodded, as its full of crud again.....
On the list is to fill the holes in the rear floor (so loads of mud and water doesn't come in next time) and line it with something, thinking about making storage box 2. 2 inch lift.[/img]