well its been a while so heres an update,ive made up my new adjustable panhard rod and thats all in and lookin good

after the ball joint spacers were in i set my torsions and got a wheel alignment,at which it ended up lookin like this

altho this is all good we discovered that the original cams of the adjustment dont have enuf movement to correct the camber of the lhs wheel,so ive now made a new plate which is currently being welded to the top of the a arm which will effectivly move the ball joint out 6mm from original which should hopefully correct this error,
also my tow hooks have arrived thanks to warrnen at 4wd bits and high lift is on the way,
side bars are on,4/6 mounts complete and the last two are gona be done tomorrow,they ended up looking like this once mounted

steering shaft has now been declared as not enuf spline contact so ive made up a new spacer to correct this
also the xaust from cat back i declared dead as it was rusted and full of holes so thats been removed,ive then cut 2 100mm sections out of the pipe pre the cat,1 either side of the flex bit,added a 2"freeflow muffler behind the cat followed by a 2" strait pipe to 2"mandrel bend at 90deg and then a final 2" strait pipe out the side of the truck exiting through the hole in the lower control arm bracketing,sounds good,wee bit loud but lets the engine rev out alot beter and gives it quite a bit more power to i think,atleast it drives like it has more power,will put some pics up asap
in the fuel tank situation i have cut out the xmember at the back of the chasis which used to hold the spare tyre up,im now in the process of making a replacement which will be welded to the very back of the chasis and am curently in the process of sourcing a fuel tank which will slot right up in side the newly created hole and will sit only 50-60mm below the chasis line,tank of choice for me is from a 2000 model suzuki grand vitra,ive sourced one but they want 295 so am currently questioning weather to not get the fuel pump with it and custom fit one of my 3 hilux pumps to it or wether i hunt high nd low through pickaparts to try find one for probly not more than $80
and to wrap up in conclusion,cert man checked all work done and all planned work on fri and has confirmed hes happy and told me to "finish the bloodly thing so you can have some fun",so ive got all this week off work and is planned to be on the road fully leagl by the wend of the week