The GQ axle got rolled under, clamped into place & jacked up & down to check clearances. The panhard mount on the chassis was in the way so that got hacked off. Looks good otherwise. It would have been nice to have the axle a bit further forward but as I could only shift the steering box about an inch without major re-engineering of the front end I decided to leave it in place & the axle will be in about the same spot as the original. Next the old radius arm mouts got chopped off the chassis & fabrication of the new mounts, lower & further back, started. Getting these located properly in all directions took a bit of time.

Pedal to the metal on the 200A TIG sticking these together:

Cheers
Clint