Bit more stuff been goin on over the last week or so.
Got the electric fan mounted, one hell of a squeeze, trim a bit of steel here, a bit of plastic off the grill there, and:
Had to cut a fair bit on the radiator support panel to get it in, but the panel was rooted all ready due to a P.O bein a ruff bastard when pulin the engine out. It worked really well,as now the fan has become part of the structureof the radiator support panel, and strengthend the whole thing
All wired up to thermoswitch, also with manual kill switch for those deep water crossings

:
Slapped a couple of new frost plugs in:
Bought an electric fuel pump and threw that in (mentioned that already haven't I

)
Harness are 90% in, i have one side of the lap belt looped through the seat rail, but is going tobe mounted to the floor or sill when i make up my mind.
Fuel tank in its new home:
Also fitted a LJ fuel level sender i had kicking round to the tank.
Thought that seing as i had a fuel gauge and a new temp sender in the cyclinder head, i had beter have a go at gettin somthing happening with the gauges on the dash. Took the best part of a day, lots of swearing and yelling at the wiring diagram telling it that it was wrong, but it all came down to one dodgy wire that was hiding under the dash with a really old and very loose crimp connecter
So i have a working fuel guage, temp gauge, rev counter and charge light.
Thats about it, waiting for the expansion chamber, hopefully ready on Wednesday.......................................