Page 1 of 1

Maratoto tree planting and trim

Posted: Tue Jun 03, 2008 9:27 am
by PeterVahry
Sunday 8 June at 9.30 is the start time for a run up the Maratoto trail to plant out a trial group of Kauri saplings and to trim back overgrowing vegetation from the main trail.

We will meet by the ford on Wires Rd and load up some bags of river rock for pot-hole repairs etc.

In the winter conditions, vehicles will need good tyres and people being prepared to walk if necessary, to minimise damage to the trail.

An indication of interest would be welcomed.