The opinions and viewpoints expressed by users of Offroad-Express Forums are wholly their own and not necessarily those of Offroad-Express. https://www.offroadexpress.kiwi:443/Forums/
Rod ends (only $28 bucks for a full set, thanks Appco) and brake proportioning valve to finish off the swap to front discs
Some new.. well, old seats. Was surprised to find a couple wires hanging out the bottom.. could that be a heated seat? Sweeeet
Re: September 3-4
Posted: Fri Sep 02, 2011 6:31 pm
by coxsy
installed my rebuilt injectors tonight, other little bits still to do in the weekend
Re: September 3-4
Posted: Fri Sep 02, 2011 10:10 pm
by T-Boon
Got 2 new batteries, 640cca, and a VSR, will chuck them in the boot. Got the winch back, and she`s all ready to go on with the bars.
Other than that, not a lot.
Re: September 3-4
Posted: Fri Sep 02, 2011 11:08 pm
by Sadam_Husain
Farking Curly made me go to see the doc today and they reckon I've got diabeties and have to knock off all the pies and piss drinking and start eatting lettace and shit now more importantly we pulled the clutch out of my 40 series yesterday, had a good look underneath and it was going to be too much pissing around trying to drop the gearbox, the trucks been really well built but the vacuum 4WD actuator has been slotted into the inside of the chassis rail to fit and the safari PTO shaft would be an absolute prick to get out and the PTO would have to come off the gearbox and the 3" exhaust is tucked up really tight and would have to be dissassembled and removed to get the gearbox out so we took the easier option and pulled the engine
took the clutch out to MP in Upper Hutt to get looked at, they've rebuilt it before and pulled the jobsheet out and it turns out they rebuilt it not many kms ago, he measured it up and theres next to no wear on the clutch plate lineings, the clutch is a 12" chev clutch and functions ok under normal use but spins up under hard load so it looks like it needs something a bit stronger, might look at my old 11" clutch that came out of my flatdeck, that held up better with the 350, big wheels and difflocks and shit, when I had that one built they got some good clamping pressure out of it, Beer Cruisers going to drop off the spare centreforce pressure plate sitting in his shed and I'll have a look at that as well
Re: September 3-4
Posted: Sat Sep 03, 2011 8:13 am
by rokhound
Geez Saddam I know what the main issue is there from your pics, the engine is in backwards
Re: September 3-4
Posted: Sat Sep 03, 2011 9:41 am
by Andrew1706
smurf182 wrote:Some new.. well, old seats. Was surprised to find a couple wires hanging out the bottom.. could that be a heated seat? Sweeeet
Would most likely be a sensor for putting your seatbelt on
Re: September 3-4
Posted: Sat Sep 03, 2011 10:20 am
by Sadam_Husain
rokhound wrote:Geez Saddam I know what the main issue is there from your pics, the engine is in backwards
shit the clutch guy never told me that hes trying to sell me an expensive new clutch
Re: September 3-4
Posted: Sat Sep 03, 2011 11:52 am
by coxsy
ran the engine with the new injectors no more idle fuming, reves cleanly, still abit advanced climbing out of idle, now to remove old exhaust system
Re: September 3-4
Posted: Sat Sep 03, 2011 11:40 pm
by Zooker
I got my long time suzuki project running on friday night. Then went goat hunting today. My Surf got through the river but couldnt drive up the hill. and i'm going hunting again tomorrow. I'll get some photos then
may get started on a exhaust for the zook tomorrow night. oh and I made some extended shackles.
Re: September 3-4
Posted: Sun Sep 04, 2011 9:31 am
by Drurban
This weekends achievment is to find out that my water pump is leaking, almost cooked the engine.
Good thing I spotted the leak otherwise I would of been buggered.
Re: September 3-4
Posted: Sun Sep 04, 2011 3:15 pm
by muddyhilux
my fathers day efforts along with the help from my brother in law
my good chassis 1 donor body almost there and that'll do for today
so now ill leave my project for another couple of months while i finish some others off but at least mine no looks like a truck again and the yards a bit tidier,for now that is
Re: September 3-4
Posted: Sun Sep 04, 2011 3:29 pm
by PigFmr
3inch straight through exhaust done ,nice and short as my saf is now certd as a ute,sunroof in aswell ,ujays done,and been tweaking my turbo,the finished exhaust has made a huge difference,egts came down aswell with intercooler and the 3inch exhaust vince
Re: September 3-4
Posted: Sun Sep 04, 2011 5:44 pm
by chrome
this followed me home this morning..... reg on hold mint new tires all the prep done just gotta weld it up and paint it
sweet as
Re: September 3-4
Posted: Sun Sep 04, 2011 5:48 pm
by phraza
Had a blast in woodhill today with Ray (FORGE1), Winston (Churchill) and couple other mates. Took a few pics, no action shots but heaps of other people did. Videos to come soon.
Very happy in how well the Jeep went considering the mud tyres only have 3mm left on them
Cheers
Going in shiney:
Ray giving anything a crack:
Gettin muddy!
Re: September 3-4
Posted: Sun Sep 04, 2011 6:13 pm
by suzukisport
Got 90% of the truck finished today. Off to finished getting wired then hopefully will be ready for testing at Woodhill on Saturday
Re: September 3-4
Posted: Sun Sep 04, 2011 6:56 pm
by suzookyman
suzukisport wrote:Got 90% of the truck finished today. Off to finished getting wired then hopefully will be ready for testing at Woodhill on Saturday
thought you were taking the Samurai down?
Re: September 3-4
Posted: Sun Sep 04, 2011 7:14 pm
by KIWI_TERRANO
Spent 3 hours at tyre shop sorting out new tyres for lux,
Traded my 35 cooper stt for some 265 75 r16 bfg mudterrain km2
And scored some lift springs for nothing
Re: September 3-4
Posted: Sun Sep 04, 2011 7:58 pm
by suzukisport
suzookyman wrote:
suzukisport wrote:Got 90% of the truck finished today. Off to finished getting wired then hopefully will be ready for testing at Woodhill on Saturday
thought you were taking the Samurai down?
Well I think the truck should be going by then, so may as well take it if its finished. Only thing that won't be done is new gear box mount, so will just stay with the bent one for now. Never been there before so should be interesting. If the truck hasn't been finished I will be taking the Samurai.
Re: September 3-4
Posted: Sun Sep 04, 2011 11:03 pm
by lincooln
ahh, kicked the Suzuki a bit, Saw TT3D, bought a stretchy tie for the battery and some new plugs too. Fitted stretchy tie. Saw Ray towing his Isuzu while I was on the way home. Overall, nothing much
Re: September 3-4
Posted: Mon Sep 05, 2011 8:03 am
by Dr_PC
Meet up with mudde1 went to his mates palce and checked out some dirt great for club run and had him winch me out once when the silt was to deep and the bank was to high
Good picks/vids bro. Was good to see you all again hopefully there wont be any issues next time lol
Winston have you got any of your vids on the computer yet?
Well my weekend started with picking up a trailer from Hirepool on friday and loading the bighorn up tow that to Auckland, slowly lol. Took the little one and wife to the zoo for my daughters birthday. Sunday went to woodhill was good fun until the gearbox decided to pack up, might be something to do with my driving technique anyway spent today cleaning it and taking the snorkel off standard wheels back on gearbox started coming out and have to pull the suspenion out this weekend going to RETIRE the bighorn. so it will be for sale in the next couple of weeks the wife has agreed to let me sell the bighorn and safari to get another SWB safari as I have never broken anything in the ones I have owned in the past.
Re: September 3-4
Posted: Tue Sep 06, 2011 8:14 am
by playingInTheDitch
went out to sand Island of the coast from Tapora with a couple of trucks
Ill add more photos as they come online
Re: September 3-4
Posted: Wed Sep 07, 2011 4:55 pm
by NJV6
Weekend fun!
Re: September 3-4
Posted: Wed Sep 07, 2011 8:13 pm
by crazyclark31
NJV6 wrote:Weekend fun!
Pa was in the passenger seat on that run. Reckoned it was a tuff run. said that hill climb was a real mission. Gutted couldn't go on it but am getting truck ready for upcoming comp.
Re: September 3-4
Posted: Wed Sep 07, 2011 9:13 pm
by NJV6
Na the hill climb was ok, the bogs were worse, about 200m in 4 hours
Re: September 3-4
Posted: Thu Sep 08, 2011 7:50 pm
by u13turbo
NJV6 wrote:Weekend fun!
#### that is awesome, Safari just ripping the lux up the hill
Re: September 3-4
Posted: Fri Sep 09, 2011 8:31 am
by crazyclark31
u13turbo wrote:
NJV6 wrote:Weekend fun!
#### that is awesome, Safari just ripping the lux up the hill
. From what pa was saying they had to keep foot up it to make the top. Was wet top soil with hard wet clay underneath. that truck is testamant to safaris.Is prob one of the most abused trucks in country and still just keeps on going!!!!
Re: September 3-4
Posted: Fri Sep 09, 2011 8:40 am
by NJV6
Ha ha yea but remember what Rodge does and what he needs to do are two quite different things!!
Not wrong about the abuse. Finally said enough on one trip and broke the axle housing clean off, still didn't break the cv just the axle.