Project Wombat??
Don't ask me, ask Satalite, she named it



The Plan in stages:








So this is what we are starting with:





Did you know Suzuki's are Biodegradable??
Don't believe me?? I'll show you:










The work began at the weekend. The stripping has started:




Some more bio degradation under the canopy:



I ran into a snag when I couldn't figure out how to disconnect the PTO shaft from the PTO box, as it runs through a hole in the body work. So I took some pictures of it in stead.
PTO Box on top of the T.Case:

PTO with steel sheild removed showing CV joint and rubber boot still in serviceable condition at this end:

PTO drive end of the saft with V Belt pully


I reckon I could run a little GM power steering pump off it and power the smallest hydraulic winch I can get my hands on


Lots of hours ahead of me with this project